Building Commissioning Benefits | MEP Quality Control

Building Commissioning Benefits

Building Commissioning is a Systemic Process

Building Commissioning Benefits - The Building Commissioning Guide defines commissioning as a systemic process of assuring verification and documentation, from the design phase to a minimum of one year after construction that all facility systems perform interactively in accordance with the design documentation and intent, and in accordance with the owner’s operational needs including preparation of operating personnel. (more…)

Maytag Vs Rheem | HVAC Buyers Advice

Maytag Vs Rheem | HVAC Buyers Advice

Maytag Vs Rheem - To Richard

Subject: highperformancehvac.com: Maytag vs. Rheem gas-electric packaged heater AC

From: Steve

This is an inquiry e-mail via https://highperformancehvac.com

Maytag vs rheemHi, We’re trying to compare Maytag and Rheem gas/electric heating/AC packaged units to replace our old ones. The Maytag (15 SEER, 4 ton; PPG1GFX048120) has 2-stage heating and cooling and a variable-speed blower, and 12 years of parts and labor. The Rheem (14SEER, 4 ton; RRPL-B) has a single stage and variable speed blower, 10 yr parts and we can purchase a 10 yr labor warranty.

The Maytag has seemingly better features, but we’re not familiar with Maytag heater/AC units, but know the Rheem name, and have been told it’s highly rated. One heating and air conditioning company quoted the Maytag at more than $2500 less than two other companies quoted the Rheem.

Are you familiar with the Maytag, and do you know if it’s as reliable and as highly rated as the Rheem? Also, whether the wholesale price of the Maytag is that much less than the Rheem, or is the price difference more likely to different labor costs and profit margins of the installation companies?

(more…)