Boiler Commissioning Functional Testing – Quality Assurance

Boiler Commissioning & Functional Testing - Quality AssuranceBoiler Commissioning Functional Testing - Commissioning (Cx) any type of HVAC equipment is many different procedures from the beginning of the commissioning process to the end of the process. One of the most important procedures during the Cx process is functional testing. Functional testing always precedes the final testing where a test of all the combined equipment is done in an integrated systems testing. Once successful testing is completed and all discrepancies corrected a final commissioning report is generated including all the test data and information collected during the entire process of testing and commissioning.

This is simply a basic set of tests to be performed for boiler functional testing. Each system is different and will require a different tailored test based on equipment submittals, control programs, and design documents. The pre-functional checklist should be complete before engaging in this test.