Crane Lift for a New Trane Condenser

The crane is set up to lift a new Trane air conditioner condenser into place high atop the roof on a church. Crane lifts are very expensive so the HVAC Tech's assigned to the job need to be ready for the crane. From the time the crane arrives to the time the crane departs it shouldn't take more than an hour if the HVAC tech's properly prepped for the job. This crane lifting the new Trane air conditioning condenser took approximately 45 minutes from the time the crane arrived to the time the crane departed. The HVAC tech's did a good job and were ready for the crane lift.